With a view to common problems in the current evaluation, geophysical methods and sedimentation analysis are used to calculate the residual settlement in a Jiaozuo Coalfield gob. And the suitability of the gob area for engineering construc- tion is assessed. New evaluation methods and recommendations are proposed to help investors streamline working procedures, save money and speed up construction.
© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号 地址:北京市海淀区学院路29号 邮编:100083 电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700 |