用户名: 密码: 验证码:
Construction Technology of Wire-Line Coring Hydro-Hammer Drilling in Jiakui Coalfield
详细信息   
摘要
The geological structure is complex in Jiakui coalfield with fractured rocks, loose cementation,frequent formations changing and fault fracture zone, so there are the problems such as many downhole accidents, low coring rate and low drilling efficiency. By the wire-line coring hydro-hammer technology, these technical difficulties were solved with less auxiliary time, improved drilling efficiency and coring rate and the borehole quality was ensured.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700