用户名: 密码: 验证码:
Treatments along with Drilling in Complex Strata in an Iron Ore Deposit in Anhui Province
详细信息   
摘要

Drilling in complex strata will encounter instant uncertain issues such as cave-in, rock fall, gushing water (leaking), necking, etc., which may lead to discontinuity of construction without careful plan and timely treatment. This paper, based on experience in construction in a mine, probed into successful doings, reviewed remaining issues to avoid their reoccurrence. 

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700