用户名: 密码: 验证码:
Optimization of pre-combustion capture for thermal power plants using Pinch Analysis
详细信息    查看全文
文摘
The pre-combustion capture unit for a bagasse steam cycle was designed and simulated. Heat exchanger network was designed for the carbon capture and storage unit. Heat integration was done between the power plant and the CCS unit. Energy penalty and fuel consumption of the power plant was reduced by using a HRSG.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700