Integration of absorption refrigeration system into the Rankine cycle of power plant. The absorption refrigeration system will be driven by bleeding off steam turbine. Lift rejection temperatures to a higher level to operate with air cooled condensers. The water savings are estimated to be in the range of 1.12–5.58 m3/MWh. Studying the integration with single- and double-effect absorption machines.