The annual solar power with SM varies for typical solar hybrid plants was evaluated. An economic optimization of SM for each solar hybrid plant was presented. The influences of local solar radiation and turbine operation load were estimated. The results provide a theoretical reference in designing a solar–coal hybrid project.