A multi-period multi-commodity cross dock scheduling model is proposed.
The delayed loads are stored to send at the next periods.
The problem is modeled in a mixed integer linear mathematical model.
A heuristic algorithm is proposed to solve the model.
Product substitution is considered in a cross dock system.