用户名: 密码: 验证码:
The abnormal phenomenon of class G oil well cement endangering the cementing security in the presence of retarder
详细信息    查看全文
文摘
Aiming at the abnormal phenomenon of the setting time of the cement slurry with retarder at around 85 掳C surpassing the low temperature, the effect of retarder dosage, the dosage of extra lime (CaO), the mixing mode of the extra lime (CaO), and the precuring of the cement slurry at high temperature on the setting time of cement slurry were studied. The setting time of the cement slurry without the retarder changed a little as the increase of the dosage of the extra lime while the setting time of cement slurry with the retarder shortened obviously. The free lime contained in the cement itself had a great influence on the setting time of the cement slurry with the retarder. The content drop of the Ca(OH)2 in the cement slurry induced by the reaction acceleration between C4AF and Ca(OH)2 was responsible for the abnormal phenomenon.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700