用户名: 密码: 验证码:
An improved intelligent water drops algorithm for solving multi-objective job shop scheduling
详细信息    查看全文
文摘
Multi-objective job shop scheduling (MOJSS) problems can be found in various application areas. The efficient solution of MOJSS problems has received continuous attention. In this research, a new meta-heuristic algorithm, namely the Intelligent Water Drops (IWD) algorithm is customized for solving the MOJSS problem. The optimization objective of MOJSS in this research is to find the best compromising solutions (Pareto non-dominance set) considering multiple criteria, namely makespan, tardiness and mean flow time of the schedules. MOJSS-IWD, which is a modified version of the original IWD algorithm, is proposed to solve the MOJSS problem. A scoring function which gives each schedule a score based on its multiple criteria values is embedded into the MOJSS-IWD鈥檚 local search process. Experimental evaluation shows that the customized IWD algorithm can identify the Pareto non-dominance schedules efficiently.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700