用户名: 密码: 验证码:
Long-term performance of cast-iron tunnel cross passage in London clay
详细信息    查看全文
文摘

A soil–fluid coupled model was conducted to simulate cross passage behaviour.

Cross passage affects little on the long-term surface ground settlement.

Cross passage tunnel further squats as soil consolidates after construction.

A “table” load analogy was proposed to illustrate the 3D long-term soil arching.

The tunnel segment adjacent to the opening at the axis level is critical.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700