In-situ Monitoring of Side Friction of Drilled Piles by Different Loading Methods
详细信息    查看全文
文摘
Side frictions of three groups of drilled piles under different loading methods in Xinwan interchange of Qianjiang Passageway and Connecting Project were monitored. Group 1 was loaded by static loading test method. The other two groups were loaded by dead load of superstructures, which were constructed using segmental hanging basket method and overall support cast-in-place method respectively. Axial forces and Side friction in all the piles increased gradually during the load-adding procedure. Group 1 was loaded two months after the finish of pile foundation construction, while group 3 started bearing the action of superstructure dead load six months after the finish of pile foundation construction. Piles in Group 1 and Group 3 have different repose time. Side frictions monitored from piles in Group 3, which have longer repose time, were larger than those in Group 1 under the same load. Side frictions monitored from piles in Group 2, which have longer off-time between two loading stage, were larger than those in Group 1 under the same load.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700