用户名: 密码: 验证码:
River-to-sea pressure retarded osmosis: Resource utilization in a full-scale facility
详细信息    查看全文
文摘
class="listitem" id="list_l0005">
class="label">•

A facility-scale simulation model for the power production of non-ideal river-to-sea PRO was developed.

class="label">•

The model was linked to an optimization package to determine the system variables that produce a maximum net power for the facility.

class="label">•

Energy requirements of the components external to the PRO modules were quantified by analyzing state-of-art technologies.

class="label">•

In order to maximize resource recovery, a low power density must be accepted.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700