A facility-scale simulation model for the power production of non-ideal river-to-sea PRO was developed.
The model was linked to an optimization package to determine the system variables that produce a maximum net power for the facility.
Energy requirements of the components external to the PRO modules were quantified by analyzing state-of-art technologies.
In order to maximize resource recovery, a low power density must be accepted.