用户名: 密码: 验证码:
A prediction model and numerical simulation of the location of the longwall face during the highest possible failure period of gob gas ventholes
详细信息    查看全文
文摘
We build a prediction model of the highest possible failure period of GGVs. We predict the face location when the relative displacement of strata is maximal. The lower casing has highest probability of failure due to the bigger shearing action. The early period of working face passing GGV is the highest possible failure period.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700