A simulation model of a hybrid CSP–CPV plant is developed.
Two integrated management strategies are proposed for improving its dispatchability.
A comparative study is carried out by assuming constant daily power output curves.
A dispatchability improvement is obtained by optimizing the CSP–CPV power share.