用户名: 密码: 验证码:
Development of budget-constrained rescheduling method in mega construction project
详细信息    查看全文
文摘
Since the mega construction project, typically defined as a contract that exceed $1 billion, requires a large scale financial investment, there exists a high possibility of having a budget constraint and limitation during the project execution stage as well as the planning stage. The previous studies were limited to analyzing the resource-constrained scheduling problems in the case of a budget constraint during the initial stage with smaller-scale projects and have never presented comprehensive approaches for rescheduling during the implementation stage and calculating its overall cost impact, especially on mega projects. As such, this study aimed to examine the methodologies and limitations of the previous studies and to analyze solutions to solve their shortcomings, thereby presenting a better methodology to practically apply to mega projects. Specifically, this study assessed the heuristic method that is the most applicable to mega projects and applied it to a real mega project, thereby suggesting a new method of construction process adjustment. The suggested method is expected to be appropriately used as a solution to similar issues with no restrictions to the size of the project.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700