- 作者:Hyung Seop Shim ; Seung Hyun Lee
- 关键词:life cycle cost analysis of bridge decks ; service life ; present value ; Equivalent Uniform Annual Cost (EUAC) ; monte carlo simulation ; cost benefit analysis
- 刊名:KSCE Journal of Civil Engineering
- 出版年:2016
- 出版时间:January 2016
- 年:2016
- 卷:20
- 期:1
- 页码:68-76
- 全文大小:614 KB
- 参考文献:Afshin Hatami and George Morcous (2014). “Life-cycle cost assessment for bridge management: An application to Nebraska bridge.” Proceedings of the International Conference on Computing in Civil and Building Engineering, ASCE, pp. 1779–1787, DOI: 10.1061/9780784413616.221 .
Bhaskaran, R., Palaniswamy, N., and Rengaswamy, N. S. (2006). “Lifecycle cost analysis of a concrete road bridge across open sea.” Materials Performance, Vol. 45, No. 10, pp. 51–55, ISSN 0094-1492.
Bid Information (2014). Wyoming DOT, Collected at http://www.dot.state.wy.us/home/business_with_wydot/contractors/contractor_bids.html.
Fagen, M. E. and Phares, B. M. (2000). “Life cycle cost analysis
of a low volume road bridge alternative.” Transportation Research Record 1696, Transportation Research Board, Washington, D.C., pp. 8–13, DOI: 10.3141/1696-37 .
Hearn, G.. and Xi, Y. (2007). Service life and cost comparisons for four types
of CDOT bridge decks, Colorado
Department of Transportation, Report No. CDOT-2007-2, University
of Colorado, Boulder, CO.
Guidelines and Discount Rates for Benefit-Cost Analysis
of Federal Programs (2013). Circ A-94, US Office
of management and budget, The White House.
Mohammadi, J., Guralnick, S. A., and Yan, L. (1995). “Incorporating life-cycle costs in highway
idge planning and design.” J. Transp. Eng., Vol. 121, No. 5, pp. 417–424, DOI: 10.1061/(ASCE)0733-947X(1995)121:5(417)) .CrossRef
Recording and Coding Guide for the Structure Inventory and Appraisal
of Nation’s Bridge (1995). Report No. FHWA-ED-89-044, US Dept.
of Transportation, FHWA, Washington D.C.
Robert Bartoszy ski and Magdalena Niewiadomska-Bugaj (1997). Probability and statistical inference, Wiley-Interscience, New York, N.Y. ISBN: 0471310735, pp. 401–403.
Walther, R., Reed, R., McGormley, J., and Larosche, C. (2007). Bridge evaluation for rehabilitation design considerations, NHI and FHWA, Report No. FHWA-NHI-08-013, Wiss, Janney, Elstner Associates, Inc., Northbrook, IL.
Weyers, R. and Goodwin, F. E. (1999). “Life-cycle cost analysis for zinc and other protective coatings for steel structures.” Transportation Research Record 1680, Transportation Research Board, Washington, D.C., pp. 63–73, 2001, DOI: 10.3141/1680-10 .
Ying-Hua Huang, Teresa M. Adams, and Jose A. Pincheira (2004). “Analysis
of life-cycle maintenance strategies for concrete bridge decks.” Journal
of Bridge Engineering, Vol. 9, No. 3, ASCE, pp. 250–258, DOI: 10.1061/(ASCE)1084-0702(2004)9:3(250) .CrossRef
Zayed, T., Chang, L-M., and Fricker, J. D. (2002). “Life-cycle cost analysis using deterministic and stochastic methods: Conflicting results.” J. Perform. Constr. Facil., Vol. 16, No. 2, pp. 63–74, DOI: 10.1061/(ASCE)0887-3828(2002)16:2(63)) .CrossRef
作者单位:Hyung Seop Shim (1)
Seung Hyun Lee (2)
1. WYDOT, Washington D.C., USA
2. School of Architectural Engineering, Hongik University, Sejong, 339-701, Korea
刊物类别:Engineering刊物主题:Civil Engineering
Industrial Pollution Prevention
Automotive and Aerospace Engineering and Traffic
Geotechnical Engineering
出版者:Korean Society of Civil EngineersISSN:1976-3808