用户名: 密码: 验证码:
Impact of Collaborative Decision Making in Optimized Air Traffic Control: A Game Theoretical Approach
详细信息    查看全文
  • 关键词:Air traffic control ; Collaborative decision making ; Game theory ; Aircraft scheduling problem
  • 刊名:Lecture Notes in Computer Science
  • 出版年:2016
  • 出版时间:2016
  • 年:2016
  • 卷:9855
  • 期:1
  • 页码:397-410
  • 全文大小:2,298 KB
  • 参考文献:Ball, M.O., Barnhart, C., Nemhauser, G., Odoni, A.: Air transportation: irregular operations and control. In: Handbooks in Operations Research and Management Science, vol. 14, no. 1, pp. 1–68 (2007)
    Ball, M.O., Barnhart, C., Dresner, M., Hansen, M., Neels, K.: Total Delay Impact Study. NEXTOR (2010a)
    Ball, M.O., Hoffman, R., Mukherjee, A.: Ground delay program planning under uncertainty based on the ration-by-distance principle. Transp. Sci. 44(1), 1–14 (2010b)
    Bäuerle, N., Engelhardt-Funke, O., Kolonko, M.: On the waiting time of arriving aircraft and the capacity of airports with one or two runways. Eur. J. Oper. Res. 177(2), 1180–1196 (2007)CrossRef MATH
    Beasley, J., Krishnamoorty, M., Sharaiha, Y., Abramson, D.: Scheduling aircraft landing - the static case. Transp. Sci. 34(2), 180–197 (2000)CrossRef MATH
    Bennell, J.A., Mesgarpour, M., Potts, C.N.: Airport runway scheduling. 4OR – Q. J. Oper. Res. 4(2), 115–138 (2011)CrossRef MATH MathSciNet
    Bertsimas, D., Gupta, S.: Fairness in air traffic flow management. In: INFORMS Meeting, CA, USA (2009)
    Bertsimas, D., Gupta, S.: Fairness and collaboration in network air traffic flow management: an optimization approach. Transp. Sci. 50(1), 57–76 (2015)CrossRef
    Bertsimas, D., Farias, V., Trichakis, N.: The price of fairness. Oper. Res. 59(1), 17–31 (2011)CrossRef MATH MathSciNet
    Carr, G., Erzberger, H., Neuman, F.: Airline arrival prioritization in sequencing and scheduling. In: 2nd USA/EUROPE Air Traffic Management R&D Seminar, pp. 1–11 (1998)
    CDM/FAA: Improving Air Traffic Management Together (2015). http://​cdm.​fly.​faa.​gov/​
    Clayton, E., Hilz, A.: 2015 Aviation Trends - Efficiency & Attitudes, Strategy& (2015). http://​www.​strategyand.​pwc.​com/​perspectives/​2015-aviation-trends
    Corman, F., D’Ariano, A., Hansen, I.A., Pacciarelli, D.: Optimal multi-class rescheduling of railway traffic. J. Rail Trans. Plann. Manag. 1(1), 14–24 (2011)CrossRef
    Corman, F., D’ariano, A., Pacciarelli, D., Pranzo, M.: Dispatching and coordination in multi-area railway traffic management. Comput. Oper. Res. 44, 146–160 (2015)CrossRef MATH
    D’Ariano, A., Pacciarelli, D., Pistelli, M., Pranzo, M.: Real-time scheduling of aircraft arrivals and departures in a terminal maneuvering area. Networks 65(3), 212–227 (2015)CrossRef MathSciNet
    FAA. Federal Aviation Administration (n.d.). https://​www.​faa.​gov/​air_​traffic/​
    Gröflin, H., Klinkert, A.: Scheduling with generalized disjunctive graphs: feasibility issues. In: XV Conference on European Chapter on Combinatorial Optimization (2002)
    IATA: Annual review (2015)
    Lempert, R.: RAND - Infrastructure, Safety and Environment. RAND Corporation (2012)
    Littlechild, S., Owen, G.: A simple expression for the Shapley value in a special case. Manag. Sci. 20(3), 370–372 (1973)CrossRef MATH
    Luenberger, R.A.: A traveling-salesman-based approach to aircraft scheduling in the terminal area. NASA Technical report 100062 (1988)
    Mascis, A., Pacciarelli, D.: Job shop scheduling with blocking and no-wait constraints. Eur. J. Oper. Res. 143(3), 498–517 (2002)CrossRef MATH MathSciNet
    Mason, S.J., Oey, K.: Scheduling complex job shops using disjunctive graphs: a cycle elimination procedure. Int. J. Prod. Res. 41(5), 981–994 (2003)CrossRef
    Roy, S., Sussman, B.: Les Problèmes d’ordonnancement avec contraintes disjonctives. Note DS n.9 bis, SEMA, Montrouge (1964)
    Samà, M., D’Ariano, A., D’Ariano, P., Pacciarelli, D.: Optimal aircraft scheduling and routing at a terminal control area during disturbances. Transp. Res. Part C 47(1), 61–85 (2014)CrossRef
    Samà, M.A., D’Ariano, A., D’Ariano, P., Pacciarelli, D.: Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations. Omega (2016). doi:10.​1016/​j.​omega.​2016.​04.​003
    Samà, M., D’Ariano, A., Pacciarelli, D.: Rolling horizon approach for aircraft scheduling in the terminal control area of busy airports. Transp. Res. Part E 60(1), 140–155 (2013)CrossRef
    Shapley, L.S.: A value for n-person games. Ann. Math. Stud. 28, 307–317 (1953)MATH MathSciNet
    Skowron, P., Rzadca, K.: Fair share is not enough: measuring fairness in scheduling with cooperative game theory. In: Wyrzykowski, R., Dongarra, J., Karczewski, K., Waśniewski, J. (eds.) PPAM 2013, Part II. LNCS, vol. 8385, pp. 38–48. Springer, Heidelberg (2014)CrossRef
    Soomer, M.J., Franx, G.J.: Scheduling aircraft landings using airlines’ preferences. Eur. J. Oper. Res. 190(1), 277–291 (2008)CrossRef MATH MathSciNet
    Von Neumann, J., Morgenstern, O.: Theory of Games and Economic Behavior. Princeton University Press, Princeton (1953)MATH
  • 作者单位:Manish Tripathy (16) (17)
    Marcella Samà (18)
    Francesco Corman (16)
    Gabriel Lodewijks (16)

    16. Transport Engineering and Logistics, Delft University of Technology, Delft, The Netherlands
    17. Fuqua School of Business, Duke University, Durham, NC, USA
    18. Department of Engineering, Roma Tre University, Rome, Italy
  • 丛书名:Computational Logistics
  • ISBN:978-3-319-44896-1
  • 刊物类别:Computer Science
  • 刊物主题:Artificial Intelligence and Robotics
    Computer Communication Networks
    Software Engineering
    Data Encryption
    Database Management
    Computation by Abstract Devices
    Algorithm Analysis and Problem Complexity
  • 出版者:Springer Berlin / Heidelberg
  • ISSN:1611-3349
  • 卷排序:9855
文摘
Air traffic is growing, putting increasing stress to airports and air traffic control. The introduction of optimized approaches, based on mathematical optimization paradigms for planning and real time control, can be a possible solution to this issues. We investigate the practical setting of an advanced optimization algorithm in a real-life setting of a major airport where traffic is diverse, belonging to multiple companies. We compare to the incumbent practice (based on First Come First Served) in order to determine a gap with optimized solutions computed by advanced algorithms. Those are based on a job shop scheduling model and solved by a commercial solver.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700