用户名: 密码: 验证码:
New-Type Horizontal Well Completion Method of Delaying and Controling Bottom Water Coning
详细信息    查看全文 | 下载全文 | 推荐本文 |
  • 作者:Xiong YoumingLuo DonghongTang HaixiongWei Hong' anHuang ZhiHu Xiaokang
  • 会议时间:2007-10-20
  • 关键词:水平井 ; 完井方法 ; New-Type ; Horizontal ; Well Completion Method ; Delaying
  • 作者单位:Xiong Youming,Huang Zhi,Hu Xiaokang(State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation,Sichuan Chengdu 610500,P. R. China)Luo Donghong,Tang Haixiong,Wei Hong' an(Shenzhen Branch Co. Of CNOOC,Shenzhen,Guangdong 518067,RRChina)
  • 母体文献:2007年油气藏地质及开发工程国家重点实验室第四次国际学术会议论文集
  • 会议名称:2007年油气藏地质及开发工程国家重点实验室第四次国际学术会议
  • 会议地点:成都
  • 主办单位:中国石油学会
  • 语种:chi
摘要
For bottom water drive fields, being developed with horizontal wells could delay bottom water coning. But the general horizontal well completion methods have very limit effects on delaying bottom water coning and couldn't solve the problem of water plugging either. As a result, the horizontal wells in many fields couldn't continue producing after BT water breakthrough) so they were shut down. The open hole completion has always been used in horizontal wells in fractured carbonate formations. The bottom waters gradually started to coning as the field is producing, and we couldn't exactly judge the right intervals and positions of WBT, so it's hard to do chemical water plugging later. Meanwhile, t's impossible to adopt mechanical water plugging either because open hole completion had been adopted. In sand formations, the completion methods normally being adopted in horizontal wells are directly running liners or sand control screens in open-hole wells. Considering bottom water coning and the later water plugging — the two important roblems xisting in developing horizontal wells in bottom water fields, this paper studies and brings forward a well completion method called perforated liner with ECP combining with special water plugging completion pipe strings. In this method, the blind pipes with ECPs in both ends and the screen pipes are arrayed alternately, so the hole annulus are ealed with ECPs and the long blind pipe could delay the bottom water coning. It provides a new thought and matched completion method for developing bottom water oilfields reasonably. Right now this method has been applied in extended reach wells in biohermal limestone formations in South China Sea.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700