摘要
通过负荷预测和电力平衡进行南疆三地州电力流分析,阐述阿克苏—巴楚—喀什750kV输变电工程的作用,并结合全球能源互联网规划,对新疆南部超高压电网目标网架结构进行了探讨,验证了目标网架的合理性。
The power flow of Southern Xinjiang by the load forecast power balance was analyzed.The function of AksuBachu-Kashgar 750 kV power transmission was discussed.Combined with integrated global energy Internet planning,the structure of the target network frame in Southern Xinjiang was studied and the rationality of the target power grid was verified.
引文
[1]张东明.特高压直流输电对新疆电网稳定性的影响[D].乌鲁木齐:新疆大学,2014.
[2]黄耀德.新疆750千伏超高压电网规划与若干问题研究[D].北京:华北电力大学,2015.
[3]晓珺,张志强,郑超,等.750kV伊库线投运对新疆电网安全稳定特性的影响[J].中国电力,2016,49(8):21-25.