引文
[1]郑峰,段卫东,钟冬望,等.爆破震动研究现状及存在问题的探讨[J].爆破,2006,23(1):92-94.[1]ZHENG Feng,DUAN Wei-dong,ZHONG Dong-wang,etal.Research progress and existing problems of blasting vi-bration[J].Blasting,2006,23(1):92-94.(in Chinese)
[2]文建华,李新平,张文成,等.复合遗传算法在爆破震动测试参数确定中的研究[J].岩土力学,2005,26(1):160-162.[2]WEN Jian-hua,LI Xin-ping,ZHANG Wen-cheng,et al.Astudy of parameter inversion of blasting vibration based oncompositely genetic algorithm[J].Rock and Soil Mechan-ics,2005,26(1):160-162.(in Chinese)
[3]林从谋,逄焕东,王其升,等.隧道掘进爆破地震峰值神经网络预报研究[J].岩土力学,2004,25(S1):125-126.[3]LIN Cong-mou,PANG Huan-dong,WANG Qi-sheng,etal.Study on neural network prediction of peak amplitudeof blasting ground vibration for tunneling[J].Rock andSoil Mechanics,2004,25(S1):125-126.(in Chinese)
[4]言志信,言浬,江平,等.爆破振动峰值速度预报方法探讨[J].振动与冲击,2010,29(5):179-182.[4]YAN Zhi-xin,YAN Li,JIANG Ping,et al.Prediction methodsfor blasting-induced ground vibration velocity[J].Journal ofVibration and Shock,2010,29(5):179-182.(in Chinese)
[5]杨佑发,崔波.爆破震动速度峰值的预测[J].振动与冲击,2009,28(10):195-198.[5]YANG You-fa,CUI Bo.Prediction for vibration intensitydue to blasting induced ground motions[J].Journal of Vi-bration and Shock,2009,28(10):195-198.(in Chinese)
[6]史秀志,董凯程,邱贤阳,等.基于支持向量机回归爆破振动速度预测分析[J].工程爆破,2009,15(3):28-30.[6]SHI Xiu-zhi,DONG Kai-cheng,QIU Xian-yang,et al.A-nalysis of the ppv prediction of blasting vibration based onsupport vector machine regression[J].Engineering Blas-ting,2009,15(3):28-30.(in Chinese)
[7]吕涛,石永强,黄诚,等.非线性回归法求解爆破振动速度衰减公式参数[J].岩土力学,2007,28(9):1871-1878.[7]LV Tao,SHI Yong-qiang,HUANG Cheng,et al.Study onattenuation parameters of blasting vibration by nonlinearregression analysis[J].Rock and Soil Mechanics,2007,28(9):1871-1878.(in Chinese)
[8]王民寿,郭庆海.用双随机变量回归改进爆破振速回归分析[J].爆炸与冲击,1998,18(3):283-288.[8]WANG Min-shou,GUO Qing-hai.Regression analysis ofblasting vibrational velocity by the double random variablemethod[J].Explosion and Shock Waves,1998,18(3):283-288.(in Chinese)
[9]邹晓磊,薛桂玉.大坝监测数据异常值识别方法探讨[J].水电能源科学,2009,27(5):83-85.[9]ZHOU Xiao-lei,XUE Gui-yu.Study on method of identif-ying outliers about dam monitoring data[J].Water Re-sources and Power,2009,27(5):83-85.(in Chinese)
[10]张耀平,曹平,董陇军.岩石抗剪强度计算的稳健回归模型及其应用[J].科技导报,2010,28(7):91-95.[10]ZHANG Yao-ping,CAO Ping,DONG Long-jun.A robustregression model and its application in calculating shearstrength of rock[J].Science&Technology Review,2010,28(7):91-95.(in Chinese)
[11]PETER J ROUSSEEUW.Robust regression and outlierdetection[M].Toronto:John Wiley&Sons,1987.
[12]The Math Works,Inc.Curve Fitting ToolboxTM User'sGuide(Version 3.2)[M].The Math Works,2011.
[13]陈士海,逄焕东.爆破灾害预测与控制[M].北京:煤炭工业出版社,2006.[13]CHEN Shi-hai,PANG Huan-dong.Forcast and control ofblasting disaster[M].Peking:Coal Industry Press,2006.(in Chinese