用户名: 密码: 验证码:
Feasibility study on two schemes for alleviating the underground heat accumulation of the ground source heat pump
详细信息    查看全文
文摘

A scheme of operating cooling tower in transitional season is proposed for HGSHP.

The other scheme that HGSHP combined with chiller cooling system is also proposed.

The two schemes are studied with TRNSYS software.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700