A local branching heuristic is used to tackle the open pit mine scheduling.
An adaptive branching scheme is developed and combined with local branching.
A heuristic is developed to generate starting feasible solutions for local branching.
Minimum resource requirements are considered.
A comparison is drawn between the proposed methodology and other techniques.
© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号 地址:北京市海淀区学院路29号 邮编:100083 电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700 |