用户名: 密码: 验证码:
Bayesian network-based risk assessment for hazmat transportation on the Middle Route of the South-to-North Water Transfer Project in China
详细信息    查看全文
  • 作者:Xuan Wang ; Jie Zhu ; Fangbing Ma ; Chunhui Li…
  • 关键词:Risk assessment ; Hazmat transportation ; Bayesian network ; Uncertainty ; South ; to ; North Water Transfer Project in China
  • 刊名:Stochastic Environmental Research and Risk Assessment (SERRA)
  • 出版年:2016
  • 出版时间:March 2016
  • 年:2016
  • 卷:30
  • 期:3
  • 页码:841-857
  • 全文大小:1,558 KB
  • 参考文献:Arentze TA (2013) Adaptive personalized travel information systems: a Bayesian method to learn users’ personal preferences in multimodal transport networks. IEEE Trans Intell Transp Syst 14(4):1957–1966CrossRef
    Blasco J, Duran-Grados V, Hampela M, Moreno-Gutierrez J (2014) Towards an integrated environmental risk assessment of emissions from ships’ propulsion systems. Environ Int 66:44–47CrossRef
    Cai YP, Huang GH, Yang ZF, Tan Q (2009) Identification of optimal strategies for energy management systems planning under multiple uncertainties. Appl Energ 86(10):480–495
    Cai YP, Huang GH, Tan Q, Yang ZF (2011) An integrated approach for climate-change impact analysis and adaptation planning under multi-level uncertainties. Part I: Methodology. Renew Sust Energ Rev 15(6):2779–2790
    Cassini P (1998) Road transportation of dangerous goods: quantitative risk assessment and route comparison. J Hazard Mater 61(1–3):133–138CrossRef
    Chen C, Huang GH, Li YP, Zhou Y (2013) A robust risk analysis method for water resources allocation under uncertainty. Stoch Environ Res Risk Assess 27(3):713–723CrossRef
    Chu FL, Ye L (2012) Competency evaluation of rail transport drivers based on Bayesian networks. China Railw Sci 33:127–131 (in Chinese)
    Cui W, Li SS, Chen WX (2011) Effect of offtakes operation schemes on hydraulic control performances of main canal in Middle Route of South-to-North Water Transfer Project. J Hydraul Eng ASCE 42:1316–1321
    Duarte HDO, Droguett EL, Araujo M, Teixeira SF (2013) Quantitative ecological risk assessment of industrial accidents: the case of oil ship transportation in the coastal tropical area of northeastern Brazil. Hum Ecol Risk Assess 19(6):1457–1476CrossRef
    Emergency water supply project feasibility study report of section from Beijing to Shijiazhuang of Middle Route of South-to-North Water Transfer Project (2003) Water Resources and Hydropower Survey and Design Institute of Hebei Province, China
    Emergency water supply project preliminary design report of segment from Shijiazhuang to Northen Juma River. (2004) Water Resources And Hydropower Survey And Design Institute of Hebei Province,China
    Eskesen SD, Tengborg P, Kampmann J, Veicherts HT (2004) Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2. Tunn Undergr Space Technol 19(3):217–237
    Fan YR, Huang GH, Guo P, Yang AL (2012) Inexact two-stage stochastic partial programming: application to water resources management under uncertainty. Stoch Environ Res Risk Assess 26(2):281–293CrossRef
    Farmani R, Henriksen HJ, Savic D (2009) An evolutionary Bayesian belief network methodology for optimum management of groundwater contamination. Environ. Modell. Softw 24(3):303–310CrossRef
    Giri S, Singh AK (2014) Risk assessment, statistical source identification and seasonal fluctuation of dissolved metals in the Subarnarekha River, India. J Hazard Mater 265:305–314CrossRef
    Gregoriades A, Mouskos KC (2013) Black spots identification through a Bayesian Networks quantification of accident risk index. Transp Res Part C 28(SI):28–43
    Grimmelt MJ, Schueller GI (1982) Benchmark study on methods to determine collapse failure probabilities of redundant structures. Struct Saf 1(2):93–106CrossRef
    Kasiviswanathan KS, Sudheer KP (2013) Quantification of the predictive uncertainty of artificial neural network based river flow forecast models. Stoch Environ Res Risk Assess 27:137–146CrossRef
    Kazaras K, Konstandinidou M, Nivolianitoub Z (2013) Enhancing road tunnel risk assessment with a fuzzy system based on the CREAM methodology. Chem Eng Trans 31:349–354
    Lasorne B, Gatti F, Desouter-Lecomte M (2004) Cumulative isomerization probability studied by various transition state wave packet methods including the MCTDH algorithm. Benchmark: HCN → CNH isomerization. J Chem Phys 121(2):644–654CrossRef
    Lehikoinen A, Luoma E, Mantyniemi S, Kuikka S (2013) Optimizing the recovery efficiency of Finnish oil combating vessels in the Gulf of Finland using Bayesian networks. Environ Sci Technol 47(4):1792–1799CrossRef
    Lehmann A, Hinrichsen H, Getzlaff K (2014) Identifying potentially high risk areas for environmental pollution in the Baltic Sea. Boreal Environ Res 19(2):140–152
    Li YP, Huang GH (2013) Risk analysis and management for water resources systems. Stoch Environ Res Risk Assess 27(3):593–597CrossRef
    Li DQ, Yi LL (2007) Reliability analysis of earth dam based on Bayesian network. J. Wuhan Univ (Eng Sci) 06:24–29 (in Chinese)
    Li YJ, He P, Xiao WH, Liu B (2012) The research of water environment cumulative impacts of delivery canal on East Route of South-to-North Water Transfer Project. Procedia Eng 28:287–291CrossRef
    Liu B (2010) An introduction to Bayesian techniques for sensor networks. In: Wireless algorithms, systems, and applications, vol 6221. Springer, Berlin, pp 307–313
    Mahboob Q, Schone E, Kunze M, Trinckauf J, Maschek U (2012) Application of importance measures to transport industry: computation using Bayesian networks and fault tree analysis. IEEE, New York, pp 17–22
    Marhavilas PK, Koulouriotis DE (2008) A risk-estimation methodological framework using quantitative assessment techniques and real accidents’ data: application in an aluminum extrusion industry. J Loss Prev Proc 21(6):596–603CrossRef
    Merle G, Roussel JM, Lesage JJ (2014) Quantitative analysis of dynamic fault trees based on the structure function. Qual Reliab Eng Int 30(1):143–156CrossRef
    Rebelo A, Ferra I, Goncalves I, Marques AM (2014) A risk assessment model for water resources: releases of dangerous and hazardous substances. J Environ Manag 140:51–59CrossRef
    Reniers G, Dullaert W (2012) TePiTri: a screening method for assessing terrorist-related pipeline transport risks. Secur J 25(2):173–186CrossRef
    Reniers GLL, Jongh DK, Gorrens B, Lauwers D, Van Leest M, Witlox F (2010) Transportation Risk Analysis tool for hazardous Substances (TRANS)—a user-friendly, semi-quantitative multi-mode hazmat transport route safety risk estimation methodology for Flanders. Transp Res Part D 15(8):489–496CrossRef
    Tan Q, Huang GH, Cai YP (2011) Radial interval chance-constrained programming for agricultural non-point source water pollution control under uncertainty. Agr Water Manage 98(10):1595–1606
    Tao YJ, Hu H (2012) An modular method for system reliability analysis based on binary decision diagram and Bayesian network. Monmouth Junction/Science Press, South Brunswick Township/Beijing, pp 354–358
    Topuz E, Talini I, Aydin E (2011) Integration of environmental and human health risk assessment for industries using hazardous materials: a quantitative multi criteria approach for environmental decision makers. Environ Int 37(2):393–403CrossRef
    Uusitalo L (2007) Advantages and challenges of Bayesian networks in environmental modelling. Ecol Model 203(3–4):312–318CrossRef
    Van RK, Macharis C, Mairesse O (2013) Risk analysis system for the transport of hazardous materials. J Saf Res 45:55–63CrossRef
    Verma M, Verter V, Gendreau M (2011) A tactical planning model for railroad transportation of dangerous goods. Transp Sci 45(2):163–174CrossRef
    Wang S, Huang GH (2013) An interval-parameter two-stage stochastic fuzzy program with type-2 membership functions: an application to water resources management. Stoch Environ Res Risk Assess 27:1493–1506CrossRef
    Wang S, Huang GH (2014) An integrated approach for water resources decision making under interactive and compound uncertainties. Omega 44:32–40CrossRef
    Wang S, Huang GH (2015) A multi-level Taguchi-factorial two-stage stochastic programming approach for characterization of parameter uncertainties and their interactions: an application to water resources management. Eur J Oper Res 240:572–581CrossRef
    Wang Y, Sun Y (2010) Bayesian networks analysis on the accidents of air transportation of the hazardous goods. J Saf Res 10:163–166
    Whelan G, Kim K, Pelton MA, Soller JA, Castleton KJ, Molina M, Pachepsky Y, Zepp R (2014) An integrated environmental modeling framework for performing Quantitative Microbial Risk Assessments. Environ Modell Softw 55:77–91CrossRef
    Will S, Barry TH, Terence UC (2014) A Bayesian network approach to support environmental flow restoration decisions in the Yarra River, Australia. Stoch Environ Res Risk Assess 28:57–65CrossRef
    Xiao QJ, Zhu ZD, Mou RF (2013) Analysis and related preventive measures of explosion risk factors of LPG rail transport. Adv Mater Res 634–638:3696–3700CrossRef
    Xie YL, Huang GH (2014) Development of an inexact two-stage stochastic model with downside risk control for water quality management and decision analysis under uncertainty. Stoch Environ Res Risk Assess 28(6):1555–1575CrossRef
    Xie P, Xu B (2011) Effects of the middle route of China’s South-to-North Water Transfer Project on water environment in the middle-downstream of Hanjiang River. Int Assoc Hydrol Sci 350:283–289 (in Chinese)
    Yang J, Li F, Zhou J, Zhang L, Huang L, Bi J (2010) A survey on hazardous materials accidents during road transport in China from 2000 to 2008. J Hazard Mater 184(1):647–653CrossRef
    Zhang G, Yau KKW, Chen GH (2013) Risk factors associated with traffic violations and accident severity in China. Accid Anal Prev 59:18–25CrossRef
    Zhang XW, Li YP, Huang GH, Zeng XT (2015) An inexact joint-probabilistic programming method for risk assessment in water resources allocation. Stoch Environ Res Risk Assess. doi:10.​1007/​s00477-014-1008-y
    Zhao L, Wang X, Qian Y (2012) Analysis of factors that influence hazardous material transportation accidents based on Bayesian networks: a case study in China. Saf Sci 50(4SI):1049–1055CrossRef
  • 作者单位:Xuan Wang (1) (2)
    Jie Zhu (1) (2)
    Fangbing Ma (3)
    Chunhui Li (2)
    Yanpeng Cai (1)
    Zhifeng Yang (1) (2)

    1. State Key Laboratory of Water Environment Simulation, School of Environment, Beijing Normal University, Beijing, 100875, China
    2. Key Laboratory for Water and Sediment Sciences of the Ministry of Education, School of Environment, Beijing Normal University, Beijing, 100875, China
    3. Shidu Town People’s Government, Beijing, 102411, China
  • 刊物类别:Earth and Environmental Science
  • 刊物主题:Environment
    Mathematical Applications in Environmental Science
    Mathematical Applications in Geosciences
    Probability Theory and Stochastic Processes
    Statistics for Engineering, Physics, Computer Science, Chemistry and Geosciences
    Numerical and Computational Methods in Engineering
    Waste Water Technology, Water Pollution Control, Water Management and Aquatic Pollution
  • 出版者:Springer Berlin / Heidelberg
  • ISSN:1436-3259
文摘
A Bayesian network-based risk assessment (BN-RA) model was developed to assess the risk of hazmat transportation by identifying, modeling, and quantitatively calculating the risk on the Middle Route of the South-to-North Water Transfer Project (MRSNWTP) in China. First, we selected seven parameters from five categories of impact factors (i.e., human, vehicle, tank, weather, and road environment) as quintessential risk factors for accidents. Second, we used the developed BN-RA model to predict the probability of accidents. Third, using bidirectional inference in the BN approach, we analyzed and ranked the importance of the effects of these factors. The developed model was subsequently applied to assess the risks of major bridges crossing canals with different pavement grades and traffic flow levels both at present and in the future for the Beijing-Shijiazhuang Section of the MRSNWTP. The results indicated the following: (1) Although the overall potential risk of hazmat transportation accidents on all bridges in the Beijing-Shijiazhuang Section was fairly low (e.g., 0.08 %), the impacts cannot be ignored because of the potential for huge losses. (2) According to the analysis of many factors that may affect accidents, the driving patterns of drivers exerted the strongest influence on the probability of an accident, followed by vehicle conditions and lighting conditions. (3) If a vehicle were to fail, the highest probability (0.17 %) of an accident would arise if it were traveling on a road with no street lighting and poor road conditions at night. (4) Assuming that a vehicle was in good condition, the highest probability (0.12 %) of an accident arised when the vehicle suddenly encountered poor road conditions with no lights on a foggy night. (5) The predicted probabilities of accidents on Bridge TCWRR (short for the Tang County West Ring Road Bridge) in the short (i.e., the year 2017), medium (i.e., the year 2022) and long terms (i.e., the year 2027) were 3.25 × 10−4, 5.37 × 10−4, and 8.89 × 10−4, respectively. For Bridge DNR (short for the Dian Bridge on the North Road), these values were 8.64 × 10−6, 1.02 × 10−5, and 1.21 × 10−5, respectively. Based on the risk assessment results, to lower the accident probability and avoid the serious consequences resulting from hazmat transportation accidents, we developed an appropriate emergency response program to reduce potential hazards. This research resolved the problems of randomness and uncertainty associated with hazmat transportation in the MRSNWTP and can provide a reference for the effective prevention of hazmat transportation accidents and scientific decision-making in risk management.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700