用户名: 密码: 验证码:
Evaluation of Groundwater Leakage into a Drainage Tunnel in Jinping-I Arch Dam Foundation in Southwestern China: A Case Study
详细信息    查看全文
  • 作者:Yi-Feng Chen ; Jia-Min Hong ; Hua-Kang Zheng ; Yi Li
  • 关键词:Jinping ; I arch dam ; Groundwater flow ; Fractured rocks ; Seepage control ; Inverse modeling
  • 刊名:Rock Mechanics and Rock Engineering
  • 出版年:2016
  • 出版时间:March 2016
  • 年:2016
  • 卷:49
  • 期:3
  • 页码:961-979
  • 全文大小:5,340 KB
  • 参考文献:Alcolea A, Carrera J, Medina A (2006) Pilot points method incorporating prior information for solving the groundwater flow inverse problem. Adv Water Resour 29(11):1678–1689CrossRef
    Bastani M, Kholghi M, Rakhshandehroo GR (2010) Inverse modeling of variable-density groundwater flow in a semi-arid area in Iran using a genetic algorithm. Hydrogeol J 18(5):1191–1203CrossRef
    Bekele EG, Nicklow JW (2007) Multi-objective automatic calibration of SWAT using NSGA-II. J Hydrol 341(3):165–176CrossRef
    Carrera J, Alcolea A, Medina A, Hidalgo J, Slooten LJ (2005) Inverse problem in hydrogeology. Hydrogeol J 13(1):206–222CrossRef
    Chang L-C, Chang F-J (2009) Multi-objective evolutionary algorithm for operating parallel reservoir system. J Hydrol 377(1):12–20CrossRef
    Chen Y, Zhou C, Sheng Y (2007) Formulation of strain-dependent hydraulic conductivity for a fractured rock mass. Int J Rock Mech Min Sci 44(7):981–996CrossRef
    Chen Y, Zhou C, Zheng H (2008) A numerical solution to seepage problems with complex drainage systems. Comput Geotech 35(3):383–393CrossRef
    Chen Y, Zhou C, Jing L (2009) Modeling coupled THM processes of geological porous media with multiphase flow: theory and validation against laboratory and field scale experiments. Comput Geotech 36(8):1308–1329CrossRef
    Chen Y, Hu R, Zhou C, Li D, Rong G, Jiang Q (2010) A new classification of seepage control mechanisms in geotechnical engineering. J Rock Mech Geotech Eng 2(3):209–222CrossRef
    Chen Y, Hu R, Zhou C, Li D, Rong G (2011) A new parabolic variational inequality formulation of Signorini’s condition for non-steady seepage problems with complex seepage control systems. Int J Numer Anal Methods Geomech 35(9):1034–1058CrossRef
    Coli M, Pinzani A (2014) Tunnelling and hydrogeological issues: a short review of the current state of the art. Rock Mech Rock Eng 47(3):839–851CrossRef
    Dai Z, Keating E, Gable C, Levitt D, Heikoop J, Simmons A (2010) Stepwise inversion of a groundwater flow model with multi-scale observation data. Hydrogeol J 18(3):607–624CrossRef
    Deb K, Pratap A, Agarwal S, Meyarivan T (2002) A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans Evol Comput 6(2):182–197CrossRef
    Garcia LA, Shigidi A (2006) Using neural networks for parameter estimation in ground water. J Hydrol 318(1):215–231CrossRef
    Garzonio CA, Piccinini L, Gargini A (2014) Groundwater modeling of fractured aquifers in mines: the case study of Gavorrano (Tuscany, Italy). Rock Mech Rock Eng 47(3):905–921CrossRef
    Gill MK, Kaheil YH, Khalil A, McKee M, Bastidas L (2006) Multiobjective particle swarm optimization for parameter estimation in hydrology. Water Resour Res 42(7):W07417. doi:10.​1029/​2005WR004528 CrossRef
    Gong W, Cai Z, Jiang L (2008) Enhancing the performance of differential evolution using orthogonal design method. Appl Math Comput 206(1):56–69CrossRef
    Hernandez AF, Neuman SP, Guadagnini A, Carrera J (2006) Inverse stochastic moment analysis of steady state flow in randomly heterogeneous media. Water Resour Res 42(5):W05425. doi:10.​1029/​2005WR004449 CrossRef
    Karahan H, Ayvaz MT (2008) Simultaneous parameter identification of a heterogeneous aquifer system using artificial neural networks. Hydrogeol J 16(5):817–827CrossRef
    Karpouzos DK, Delay F, Katsifarakis KL, de Marsily G (2001) A multipopulation genetic algorithm to solve the inverse problem in hydrogeology. Water Resour Res 37(9):2291–2302CrossRef
    Lamas LN, Leitão NS, Esteves C, Plasencia N (2014) First infilling of the Venda Nova II unlined high-pressure tunnel: observed behaviour and numerical modelling. Rock Mech Rock Eng 47(3):885–904CrossRef
    Li Y, Chen Y, Jiang Q, Hu R, Zhou C (2014) Performance assessment and optimization of seepage control system: a numerical case study for Kala underground powerhouse. Comput Geotech 55:306–315CrossRef
    Mao D, Yeh T-CJ, Wan L, Hsu K-C, Lee C-H, Wen J-C (2013) Necessary conditions for inverse modeling of flow through variably saturated porous media. Adv Water Resour 52:50–61CrossRef
    Neuman SP (1973) Calibration of distributed parameter groundwater flow models viewed as a multiple-objective decision process under uncertainty. Water Resour Res 9(4):1006–1021CrossRef
    Nilsen B (2014) Characteristics of water ingress in Norwegian subsea tunnels. Rock Mech Rock Eng 47(3):933–945CrossRef
    Perello P, Baietto A, Burger U, Skuk S (2014) Excavation of the Aica-Mules pilot tunnel for the Brenner base tunnel: information gained on water inflows in tunnels in granitic massifs. Rock Mech Rock Eng 47(3):1049–1071CrossRef
    Qi S, Wu F, Yan F, Lan H (2004) Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station. Eng Geol 73(1):129–144CrossRef
    Rafiai H, Jafari A, Mahmoudi A (2013) Application of ANN-based failure criteria to rocks under polyaxial stress conditions. Int J Rock Mech Min Sci 59:42–49
    Rao SVN, Thandaveswara BS, Bhallamudi SM, Srinivasulu V (2003) Optimal groundwater management in deltaic regions using simulated annealing and neural networks. Water Resour Manag 17(6):409–428CrossRef
    Reed PM, Minsker BS (2004) Striking the balance: long-term groundwater monitoring design for conflicting objectives. J Water Resour Plann Manage 130(2):140–149CrossRef
    Shigidi A, Garcia LA (2003) Parameter estimation in groundwater hydrology using artificial neural networks. J Comput Civ Eng 17(4):281–289CrossRef
    Snow DT (1969) Anisotropie permeability of fractured media. Water Resour Res 5(6):1273–1289CrossRef
    Valstar JR, McLaughlin DB, te Stroet CBM, van Geer FC (2004) A representer-based inverse method for groundwater flow and transport applications. Water Resour Res 40(5):W05116. doi:10.​1029/​2003WR002922 CrossRef
    Virbulis J, Bethers U, Saks T, Sennikovs J, Timuhins A (2013) Hydrogeological model of the Baltic Artesian Basin. Hydrogeol J 21(4):845–862CrossRef
    Woodbury AD, Ulrych TJ (2000) A full-Bayesian approach to the groundwater inverse problem for steady state flow. Water Resour Res 36(8):2081–2093CrossRef
    Yang YS, Cronin AA, Elliot T, Kalin RM (2004) Characterizing a heterogeneous hydrogeological system using groundwater flow and geochemical modelling. J Hydraul Res 42(S1):147–155CrossRef
    Zhou C, Liu W, Chen Y, Hu R, Wei K (2015) Inverse modeling of leakage through a rockfill dam foundation during its construction stage using transient flow model, neural network and genetic algorithm. Eng Geol 187:183–195CrossRef
  • 作者单位:Yi-Feng Chen (1)
    Jia-Min Hong (1)
    Hua-Kang Zheng (1)
    Yi Li (2)
    Ran Hu (1)
    Chuang-Bing Zhou (1) (3)

    1. State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan, 430072, China
    2. School of Hydraulic Engineering, Changsha University of Science and Technology, Changsha, 410114, China
    3. School of Civil Engineering and Architecture, Nanchang University, Nanchang, 330031, China
  • 刊物类别:Earth and Environmental Science
  • 刊物主题:Earth sciences
    Geophysics and Geodesy
    Civil Engineering
  • 出版者:Springer Wien
  • ISSN:1434-453X
文摘
The Jinping-I double-curvature arch dam, located in the middle reach of Yalong River and with a maximum height of 305 m, is the world’s highest dam of this type that has been completed. Since the second stage of reservoir impounding, after which the reservoir water level was gradually raised by about 232 m, a significant amount of leakage was observed from the drainage holes drilled in the lowest drainage tunnel at the left bank abutment at an elevation of 1595 m a.s.l. (above sea level), with an observed maximum pressure of about 0.3 MPa. A number of investigations, including water quality analysis, digital borehole imaging, tunnel geological mapping, and in situ groundwater monitoring, were performed to examine the source of leaking, the groundwater flow paths, and the performance of the grouting curtains. By defining two objective functions using the in situ time series measurements of flow rate and hydraulic head, respectively, a multiobjective inverse modeling procedure was proposed to evaluate the permeability of the foundation rocks that was underestimated in the design stage. This procedure takes advantage of the orthogonal design, finite element forward modeling of the transient groundwater flow, artificial neural network, and non-dominated sorting genetic algorithm, hence significantly reducing the computational cost and improving the reliability of the inversed results. The geological structures that lead to the leakage were identified and the seepage flow behaviors in the dam foundation and the left bank abutment were assessed. Based on the field measurements and the inverse modeling results, the effects of the engineering treatments of the leakage event on the dam safety were analyzed. It has been demonstrated that the seepage control system is effective in lowering the groundwater level and limiting the amount of seepage in the dam foundation, and the leakage event does not pose a threat to the safety of the dam.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700