Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources
详细信息    查看全文
文摘
The paper studies a lacquer production scheduling problem formulated as a resource constrained project scheduling problem with general temporal constraints (i.e., positive and negative time-lags). This real-world scheduling problem requires so-called take-give resources that are needed from the beginning of an activity to the completion of another activity of the production process. Furthermore, we consider sequence dependent changeover times on take-give resources. We formulate this problem by mixed integer linear programming and we suggest a parallel heuristic to solve the problem. This heuristic exploits a time symmetry mapping which allows an easy construction of a schedule in the backward time orientation. In the second part of the paper, it is proven that the time symmetry mapping is bijective and involutive even for the problem with general temporal constraints, changeover times, and take-give resources. The motivation to use this mapping is to improve the performance of the heuristic and to simplify its implementation. Finally, the performance of the heuristic algorithm is evaluated on a set of lacquer production benchmarks requiring take-give resources and on standard benchmarks for the resource constrained project scheduling problem with general temporal constraints where we found new better solutions in 16 and 12 instances out of 90 for UBO500 and UBO1000 respectively.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700